Binary vs. numeric vs. date questions.
The shape of a forecast question determines what information forecasters actually give you. Pick the simplest structure that separates the real actions on the table.
Four core forecast structures compared
| Structure | Forecaster output | Best used when… | Main pitfall |
|---|---|---|---|
| Binary event | Single probability p ∈ [0, 100%] | A clear go/no-go milestone or binary vote drives a concrete action | Hides whether a miss was close or far away |
| Binary numeric threshold | Probability that X ≥ T at cutoff | A contractual trigger, budget cap, or SLA threshold already exists | Choosing an arbitrary cutoff T that nobody acts on |
| Multi-bucket / quantile | Probability across ranges or P10/P50/P90 | Sizing capacity, inventory, revenue, or cost where magnitude matters | Harder to aggregate and score without continuous proper rules |
| Target-date / milestone | Probability by Date A, Date B, or Date C | Project schedules and launch roadmaps with cascading dependencies | Unclear definition of “shipped” vs. “announced” |
Turning continuous quantities into actionable binary ladders
Full continuous probability distributions require specialized scoring (such as Continuous Ranked Probability Score or log density scoring) and are difficult for non-specialist teams to elicit quickly. When a decision needs magnitude sensitivity without complex tooling, use a 3-rung binary threshold ladder:
Each rung is a crisp binary numeric-threshold question that you can validate directly in CreateProphet’s studio and score with a standard Brier score, while the three probabilities together trace out the cumulative distribution where decisions actually change.
Why date questions fail without a “never / beyond horizon” bucket
Asking “On what date will Feature X ship?” implicitly assumes Feature X will definitely ship. If a project is canceled or indefinitely paused, pure date questions either hang open forever or require awkward late-stage Void rules. Always anchor date forecasts to explicit horizon cutoffs (“Will Feature X be generally available to 100% of self-serve accounts by 2027-06-30 23:59 UTC?”) so cancellation cleanly resolves No.
Decision-value test before choosing a format
Ask the decision owner one question: “What specific choice would we change if this probability were 25% instead of 75%?” If the answer depends on crossing one legal, financial, or engineering threshold, use a single binary threshold. If the answer scales smoothly with volume, build a three-rung threshold ladder or P10/P50/P90 quantile forecast.
Frequently asked questions
When is a binary threshold better than a continuous numeric question?
Whenever a single cutoff triggers a real operational decision (SLA breach, debt covenant, election majority, regulatory limit) or when your team wants simple Brier scoring across mixed question types.
How do you prevent incoherent probabilities across a binary threshold ladder?
Remind forecasters of monotonicity: P(X ≥ 28,000) can never exceed P(X ≥ 18,000), which can never exceed P(X ≥ 10,000). Check that order before locking the session.
Should binary questions avoid double-barreled conditions (‘Will A happen AND B happen’)?
Unless the joint outcome itself is the exact operational trigger, split A and B into separate questions. Compound questions blur which assumption failed during postmortem review.